10/1/08
Day 2
So this is where the sink and toilet were just days ago. I totally don't know what I'm talking about, but they've cut out the area to make room for the new plumbing. We're going to have a double sink and one of those new-fangled double flush toilets...fancy!
This is where the tub and shower were. They took the tile work right off the wall and (I think) they're going to put a new wall up for the subway tile. Our tub should be coming today.
They found some mold in the corner where the toilet was so they had to cut away some of the wall to allow it to dry out. We just had to do this to the downstairs bathroom because the water heater had a slow leak and molded out lots of wall down there.
So, that was yesterday...they were sawing and hammering and making all kinds of crazy sounds while Hazel (who has strep) and I sat downstairs watching our Muppet Show DVDs. Good times.
Subscribe to:
Post Comments (Atom)
2 comments:
What's a double flush toilet? Is it anything like the Love Toilet? I love home renovations!
cool progress... even though it is annoying to get through. so nice to chat with you yesterday. feel better, hazel!
Post a Comment